[1]
Pham, L. and Duong, N. 2010. STUDY AND APPLY ACO ALGORITHM IN TIME-COST OPTIMIZATION OF CONSTRUCTION PROJECT. Science and Technology Development Journal. 13, 1 (Mar. 2010), 17-30. DOI:https://doi.org/https://doi.org/10.32508/stdj.v13i1.2083.