[1]
Thong, N. 2005. APPLICATION OF DYNAMIC PROGRAMMING FOR OPTIMAL OPERATION OF A ISOLATED HYDRO POWER RESERVOIR. Science and Technology Development Journal. 8, 2 (Feb. 2005), 77-82. DOI:https://doi.org/https://doi.org/10.32508/stdj.v8i2.2974.