[1]
Hong Luan, P. 2005. LIMITATION OF APPLICATION OF THE PRIORITY FACTOR METHOD IN DETERMINING THE SEQUENCE OF CONSTRUCTION BUILDINGS EXECUTION. Science and Technology Development Journal. 8, 5 (May 2005), 64-69. DOI:https://doi.org/https://doi.org/10.32508/stdj.v8i5.3029.