[1]
Bich Thuy, L. 2004. IMPROVMENT METHOD AT THE CONNECTING POSITION BETWEEN BRIDGE AND ROAD BY USING HATELITE MATERIAL. Science and Technology Development Journal. 7, 7 (Jul. 2004), 68-73. DOI:https://doi.org/https://doi.org/10.32508/stdj.v7i7.3233.