[1]
Hang, N., Quynh Nga, T. and Khoi, D. 2021. Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization. Science and Technology Development Journal. 24, 4 (Dec. 2021), 2164-2176. DOI:https://doi.org/https://doi.org/10.32508/stdj.v24i4.3807.