(1)
Hang, N.; Quynh Nga, T.; Khoi, D. Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization. Science and Technology Development Journal 2021, 24, 2164-2176.