Pham, L., & Duong, N. (2010). STUDY AND APPLY ACO ALGORITHM IN TIME-COST OPTIMIZATION OF CONSTRUCTION PROJECT. Science and Technology Development Journal, 13(1), 17-30. https://doi.org/https://doi.org/10.32508/stdj.v13i1.2083