Hang, N., Quynh Nga, T., & Khoi, D. (2021). Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization. Science and Technology Development Journal, 24(4), 2164-2176. https://doi.org/https://doi.org/10.32508/stdj.v24i4.3807