HANG, N.; QUYNH NGA, T.; KHOI, D. Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization. Science and Technology Development Journal, v. 24, n. 4, p. 2164-2176, 31 dez. 2021.