Pham, Luan, and Nhan Duong. 2010. “STUDY AND APPLY ACO ALGORITHM IN TIME-COST OPTIMIZATION OF CONSTRUCTION PROJECT”. Science and Technology Development Journal 13 (1), 17-30. https://doi.org/https://doi.org/10.32508/stdj.v13i1.2083.