Pham, L. and Duong, N. (2010) “STUDY AND APPLY ACO ALGORITHM IN TIME-COST OPTIMIZATION OF CONSTRUCTION PROJECT”, Science and Technology Development Journal, 13(1), pp. 17-30. doi: https://doi.org/10.32508/stdj.v13i1.2083.