Thong, N. (2005) “APPLICATION OF DYNAMIC PROGRAMMING FOR OPTIMAL OPERATION OF A ISOLATED HYDRO POWER RESERVOIR”, Science and Technology Development Journal, 8(2), pp. 77-82. doi: https://doi.org/10.32508/stdj.v8i2.2974.