Bich Thuy, L. (2004) “IMPROVMENT METHOD AT THE CONNECTING POSITION BETWEEN BRIDGE AND ROAD BY USING HATELITE MATERIAL”, Science and Technology Development Journal, 7(7), pp. 68-73. doi: https://doi.org/10.32508/stdj.v7i7.3233.