Hang, N., Quynh Nga, T. and Khoi, D. (2021) “Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization”, Science and Technology Development Journal, 24(4), pp. 2164-2176. doi: https://doi.org/10.32508/stdj.v24i4.3807.