[1]
N. Hang, T. Quynh Nga, and D. Khoi, “Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization”, Science and Technology Development Journal, vol. 24, no. 4, pp. 2164-2176, Dec. 2021.