Pham, L., and N. Duong. “STUDY AND APPLY ACO ALGORITHM IN TIME-COST OPTIMIZATION OF CONSTRUCTION PROJECT”. Science and Technology Development Journal, Vol. 13, no. 1, Mar. 2010, pp. 17-30, doi:https://doi.org/10.32508/stdj.v13i1.2083.