Hang, N., T. Quynh Nga, and D. Khoi. “Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization”. Science and Technology Development Journal, Vol. 24, no. 4, Dec. 2021, pp. 2164-76, doi:https://doi.org/10.32508/stdj.v24i4.3807.