Hang, N., T. Quynh Nga, and D. Khoi. “Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization”. VNUHCM Journal of Science and Technology Development, Vol. 24, no. 4, Dec. 2021, pp. 2164-76, doi:https://doi.org/10.32508/stdj.v24i4.3807.