1.
Hang N, Quynh Nga T, Khoi D. Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization. VNUHCM Journal of Science and Technology Development [Internet]. 31Dec.2021 [cited 22Apr.2025];24(4):2164-76. Available from: http://stdj.scienceandtechnology.com.vn/index.php/stdj/article/view/3807