1.
Hang N, Quynh Nga T, Khoi D. Runoff Simulation for Pre-and-Post Hydropower Construction Periods in the Be River Catchment Using LST Model Calibrated by Differential Evolutionary Optimization. Science and Technology Development Journal [Internet]. 31Dec.2021 [cited 29Mar.2024];24(4):2164-76. Available from: http://stdj.scienceandtechnology.com.vn/index.php/stdj/article/view/3807