Open Access

Downloads

Download data is not yet available.

Abstract

Construction industry is considered to be one of the most important industries in Vietnam's economy. But many construction industry sectors have been experienced chronic problem as cost overrun. Therefore, a conceptual model of factors influencing construction cost was developed to determine the key factors that cause difference between budget cost and actual cost and some solutions are recommended to be applied to achieve the best outcome of cost. The result of analyzing 216 construction projects completed from 2002 to 2007 by companies located in Ho Chi Minh City indicated 6 main factors varying construction cost: project planners, project executives, economics, political, natural environment, fraudulent and lost. The results of multiple linear regression model confirmed the relationship between these above 6 factors and construction cost with the theories are supported at the statistically significant level of 0.05.



Author's Affiliation
Article Details

Issue: Vol 12 No 1 (2009)
Page No.: 104-117
Published: Jan 15, 2009
Section: Article
DOI: https://doi.org/10.32508/stdj.v12i1.2201

 Copyright Info

Creative Commons License

Copyright: The Authors. This is an open access article distributed under the terms of the Creative Commons Attribution License CC-BY 4.0., which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

 How to Cite
Nguyen, T., & Cao, T. (2009). CRITICAL FACTORS VARYING CONSTRUCTION COST. Science and Technology Development Journal, 12(1), 104-117. https://doi.org/https://doi.org/10.32508/stdj.v12i1.2201

 Cited by



Article level Metrics by Paperbuzz/Impactstory
Article level Metrics by Altmetrics

 Article Statistics
HTML = 952 times
Download PDF   = 504 times
Total   = 504 times