Hong Luan, P. (2005). LIMITATION OF APPLICATION OF THE PRIORITY FACTOR METHOD IN DETERMINING THE SEQUENCE OF CONSTRUCTION BUILDINGS EXECUTION. Science and Technology Development Journal, 8(5), 64-69. https://doi.org/https://doi.org/10.32508/stdj.v8i5.3029