Downloads
Abstract
This paper describes a new approach for monitoring the construction progress of the Urban Railway Construction Project “Metro line1 - Ben Thanh - Suoi Tien” by using Unmanned Aerial Vehicles (UAV) to capture high resolution imagery at different stages of the project. The advantage of the AscTec Falcon 8 systems lies in their high flexibility and efficiency in capturing the surface of an area from a low flight altitude. In addition, further information such as orthoimages, elevation models and 3D objects can easily be processed by Pix4Dmapper software. The Ground Control Points (GCPs) and GIS data were used to compare the achieved accuracy of UAV method. This study shows the feasibility of using an UAV system for acquiring the high resolution aerial images and the new opportunities for managing construction progress over time.
Issue: Vol 18 No 2 (2015)
Page No.: 104-112
Published: Jun 30, 2015
Section: Engineering and Technology - Research article
DOI: https://doi.org/10.32508/stdj.v18i2.1064
Download PDF = 657 times
Total = 657 times
Most read articles by the same author(s)
- Trung Van Le, Hoang Thi Kim Nguyen, Anh Thi Ngoc Nguyen, GIS and Remote Sensing solution for Dalat city’s soil erosion mapping , Science and Technology Development Journal: Vol 19 No 2 (2016)
- Vu Dinh Trinh, Chon Trung Le, The experimental results of the RTK GPS measurement using 3G mobile network and internet , Science and Technology Development Journal: Vol 18 No 1 (2015)
- Canh Minh Khuu, Chon Trung Le, Proposed 4D GIS for predicting the trend of housing construction in urban areas: application for District 5, Ho Chi Minh city , Science and Technology Development Journal: Vol 18 No 2 (2015)
- Trung Van Le, Hung Van Tran, Impacts of sea level rise on Tra Vinh province’s rice production , Science and Technology Development Journal: Vol 17 No 2 (2014)