Downloads
Download data is not yet available.
Abstract
A VÆ°Æ¡ng project is the one of the eight HP Project in the Vu Gia Thu Bon cascade has been approved by Government and has been being constructed since 2004. The first unit of plant proposed will be put into operation in 2008. The content of issue presents the Monte Carlo simulation method for extension of flows series data. The calculation results allow evaluating the yearly electricity energy of plant and the variation of water level in reservoir in the view of statistics.
Author's Affiliation
Article Details
Issue: Vol 12 No 18 (2009)
Page No.: 12-17
Published: Dec 15, 2009
Section: Article
DOI: https://doi.org/10.32508/stdj.v12i18.2377
How to Cite
Nguyen, T. (2009). OPERATION SEQUENCE OF A VUONG HP RESERVOIR. Science and Technology Development Journal, 12(18), 12-17. https://doi.org/https://doi.org/10.32508/stdj.v12i18.2377
Download Citation
Article Statistics
HTML = 1039 times
Download PDF = 582 times
Total = 582 times
Download PDF = 582 times
Total = 582 times