Open Access

Downloads

Download data is not yet available.

Abstract

The infracstructures to wake up the protential of economic development for the country's largest rice producing region have been rapidly built in Mekong Delta such as My Thuan Bridge, Can Tho Bridge, IA National Highway and so on. In the past, when designing the sheet pile, we had to choose the length of the sheet pile first, then calculate to check the stability and deformation of the sheet pile. The length of the pile sheet cannot be calculated directly. A study to establish a new relation for calculating the length of the sheet pile directly to protect the ways to bridges and settlements is necessary for HCMC and flooded Mekong Delta areas.



Author's Affiliation
Article Details

Issue: Vol 9 No 8 (2006)
Page No.: 65-68
Published: Aug 31, 2006
Section: Article
DOI: https://doi.org/10.32508/stdj.v9i8.2936

 Copyright Info

Creative Commons License

Copyright: The Authors. This is an open access article distributed under the terms of the Creative Commons Attribution License CC-BY 4.0., which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

 How to Cite
Huu Hue, V., & Van Pha, L. (2006). DEVELOPING A NEW RELATION TO CALCULATE THE LENGTH OF SHEET PILE FOR PROTECTING THE WAY TO THE BRIDGES OR SETTLEMENTS IN HCM AND MEKONG DELTA. Science and Technology Development Journal, 9(8), 65-68. https://doi.org/https://doi.org/10.32508/stdj.v9i8.2936

 Cited by



Article level Metrics by Paperbuzz/Impactstory
Article level Metrics by Altmetrics

 Article Statistics
HTML = 863 times
Download PDF   = 182 times
Total   = 182 times