Downloads
Download data is not yet available.
Abstract
This paper presents the method to determine the optimum height of the prestressed concrete box girder which has three continuous spans for the bridge passing the node of traffic in Ho Chi Minh City.
Author's Affiliation
Article Details
Issue: Vol 8 No 5 (2005)
Page No.: 59-63
Published: May 31, 2005
Section: Article
DOI: https://doi.org/10.32508/stdj.v8i5.3032
How to Cite
Van Nam, L., & Trong Binh, N. (2005). THE OPTIMUM HEIGHT OF THE PRESTRESSED CONCRETE BOX GIRDER WHICH HAS THREE CONTINUOUS SPANS FOR THE BRIDGE PASSING THE NODE OF TRAFFIC IN HO CHI MINH CITY. VNUHCM Journal of Science and Technology Development, 8(5), 59-63. https://doi.org/https://doi.org/10.32508/stdj.v8i5.3032
Download Citation
Article Statistics
HTML = 984 times
Download PDF = 473 times
Total = 473 times
Download PDF = 473 times
Total = 473 times