Downloads
Abstract
A VÆ°Æ¡ng project is one of the eight HHP Projects in the Vu Gia Thu Bon cascade has been approved by Government and has been constructed since 2004. first unit of the plant is proposed to be put into operation in 2008. This paper presents the method of determination of the yearly average electricity energy of the plant with the Monte Carlo simulation. The calculation results allow to evaluate the efficient of the yearly average electricity energy of the plant in the view of statistics and served for risk calculation and analysis of the project.
Issue: Vol 8 No 12 (2005)
Page No.: 79-84
Published: Dec 31, 2005
Section: Article
DOI: https://doi.org/10.32508/stdj.v8i12.3110
Download PDF = 387 times
Total = 387 times