Downloads
Abstract
The reliability of settlement measuring results for engineering construction relates a stability of benchmark group. This paper presents 2 methods for elimination of benchmarks stability: In the first method one benchmark is unchanged in height. In the second method the average of height of the benchmark group is unchanged from every observation period to the other. There are also presented height change of 3 benchmark, where 1 or 2 benchmarks change its height.
Issue: Vol 6 No 12 (2003)
Page No.: 54-62
Published: Dec 31, 2003
Section: Article
DOI: https://doi.org/10.32508/stdj.v6i12.3394
Download PDF = 385 times
Total = 385 times
Most read articles by the same author(s)
- Dao Xuan Loc, Nguyen Ngoc Lau, ADJUSTMENT OF TRAVERSE USING TO NODE METHOD , VNUHCM Journal of Science and Technology Development: Vol 6 No 3&4 (2003)