AN OPTIMAL METHOD FOR SCHEDULING CONSTRUCTION PROJECTS INCLUDING REPETITIVE ACTIVITIES IN MANY UNITS

Long Duc Luong 1, *
  1. University of Technology, VNU- HCM
Correspondence to: Long Duc Luong, University of Technology, VNU- HCM. Email: pvphuc@hcmuns.edu.vn.
Volume & Issue: Vol. 12 No. 18 (2009) | Page No.: 46-51 | DOI: 10.32508/stdj.v12i18.2382
Published: 2009-12-15

Online metrics


Statistics from the website

  • Abstract Views: 2402
  • Galley Views: 942

Statistics from Dimensions

Copyright The Author(s) 2023. This article is published with open access by Vietnam National University, Ho Chi Minh city, Vietnam. This article is distributed under the terms of the Creative Commons Attribution License (CC-BY 4.0) which permits any use, distribution, and reproduction in any medium, provided the original author(s) and the source are credited. 

Abstract

This paper presents an optimal method for scheduling construction projects including many repetitive activities in many similar units (e.g., high-rise bridges...). The objective of scheduling is to minimize the project duration. This method considers many types of activities with different characteristics (activities must be performed continuously to insure the continuity in their performances, or activities can allow interruptions in their performances) to generate a satisfactory schedule for project managers. This method uses a new scheduling algorithm to find the optimal start and finish times of activities, so that the project duration is minimized. A well-known example is used as an illustration to show advantages of this method to other methods.