This paper presents an optimal method for scheduling construction projects including many repetitive activities in many similar units (e.g., high-rise bridges...). The objective of scheduling is to minimize the project duration. This method considers many types of activities with different characteristics (activities must be performed continuously to insure the continuity in their performances, or activities can allow interruptions in their performances) to generate a satisfactory schedule for project managers. This method uses a new scheduling algorithm to find the optimal start and finish times of activities, so that the project duration is minimized. A well-known example is used as an illustration to show advantages of this method to other methods.



Author's Affiliation
Article Details

Issue: Vol 12 No 18 (2009)
Page No.: 46-51
Published: Dec 15, 2009
Section: Article
DOI: https://doi.org/10.32508/stdj.v12i18.2382

 Copyright Info

Creative Commons License

Copyright: The Authors. This is an open access article distributed under the terms of the Creative Commons Attribution License CC-BY 4.0., which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

 How to Cite
Luong, L. (2009). AN OPTIMAL METHOD FOR SCHEDULING CONSTRUCTION PROJECTS INCLUDING REPETITIVE ACTIVITIES IN MANY UNITS. Science and Technology Development Journal, 12(18), 46-51. https://doi.org/https://doi.org/10.32508/stdj.v12i18.2382

 Cited by



Article level Metrics by Paperbuzz/Impactstory
Article level Metrics by Altmetrics

 Article Statistics
HTML = 903 times
Download PDF   = 615 times
Total   = 615 times