Open Access

Downloads

Download data is not yet available.

Abstract

Based on the ability of tight combination between the professional worker-teams in scheduled plan the priority-factor method that defines the sequence of executing of construction buildings points out the earliest accomplishing time. The advantage of this method is an easy and simple way to show the good answer but not optimum. In many cases, this method proves some weakness. Thanks to the high ability of computer and its program, cyclic permutation method gives an optimum solution even with the complex scheduled plans.



Author's Affiliation
Article Details

Issue: Vol 8 No 5 (2005)
Page No.: 64-69
Published: May 31, 2005
Section: Article
DOI: https://doi.org/10.32508/stdj.v8i5.3029

 Copyright Info

Creative Commons License

Copyright: The Authors. This is an open access article distributed under the terms of the Creative Commons Attribution License CC-BY 4.0., which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

 How to Cite
Hong Luan, P. (2005). LIMITATION OF APPLICATION OF THE PRIORITY FACTOR METHOD IN DETERMINING THE SEQUENCE OF CONSTRUCTION BUILDINGS EXECUTION. Science and Technology Development Journal, 8(5), 64-69. https://doi.org/https://doi.org/10.32508/stdj.v8i5.3029

 Cited by



Article level Metrics by Paperbuzz/Impactstory
Article level Metrics by Altmetrics

 Article Statistics
HTML = 1038 times
Download PDF   = 357 times
Total   = 357 times