LIMITATION OF APPLICATION OF THE PRIORITY FACTOR METHOD IN DETERMINING THE SEQUENCE OF CONSTRUCTION BUILDINGS EXECUTION

Pham Hong Luan 1
Volume & Issue: Vol. 8 No. 5 (2005) | Page No.: 64-69 | DOI: 10.32508/stdj.v8i5.3029
Published: 2005-05-31

Online metrics


Statistics from the website

  • Abstract Views: 2951
  • Galley Views: 951

Statistics from Dimensions

Copyright The Author(s) 2023. This article is published with open access by Vietnam National University, Ho Chi Minh city, Vietnam. This article is distributed under the terms of the Creative Commons Attribution License (CC-BY 4.0) which permits any use, distribution, and reproduction in any medium, provided the original author(s) and the source are credited. 

Abstract

Based on the ability of tight combination between the professional worker-teams in scheduled plan the priority-factor method that defines the sequence of executing of construction buildings points out the earliest accomplishing time. The advantage of this method is an easy and simple way to show the good answer but not optimum. In many cases, this method proves some weakness. Thanks to the high ability of computer and its program, cyclic permutation method gives an optimum solution even with the complex scheduled plans.